Construction of Jeddah's new container terminal to start in January
- Saudi Arabia: Saturday, December 01 - 2007 at 16:20
- PRESS RELEASE
The Saudi Trade and Export Development Company (Tusdeer) announced that construction of its $443m Red Sea Gateway Terminal at Jeddah Islamic Port (JIP) will commence in January 2008.
Tusdeer has signed the civil works contract with China Harbour Engineering Company Ltd which is scheduled to be completed within 22 months. The works will include the construction of the quay wall, land reclamation and the dredging of a new 16.5m approach channel as well as other related infrastructure work.
Tusdeer has also signed a contract with Shanghai Zhenhua Port Machinery Limited (ZPMC) to provide the handling equipment for the terminal, which will include eight twin-lift 40 ship-to-shore cranes and 26 rubber-tyred gantries with double lift capability. The equipment will be delivered in three phases, the first due to arrive in May 2009.
The design and engineering for the Red Sea Gateway Terminal has been undertaken by Halcrow International of the UK. This includes a 735m main berth and 310m feeder berth with a draft of 18m.
The two berths, with an annual container handling capacity of 1.5 million teu, are planned to be open for operations in the fourth quarter of 2009. "The berths will have their own dedicated channel to the main JIP approach channel," says Mr. Aamer A. Alireza, CEO of Red Sea Gateway Terminal. "We have designed and equipped this state-of the-art container terminal accommodating our future customers' requirements as well as the growing container demand at JIP."
JIP's newest container facility will increase the port's container handling capacity by more than 45 per cent and will further increase its importance as a regional logistics hub by integrating with the Tusdeer Bonded Re-export Zone and linking to the Kingdom's new intermodal connection - the so-called Land Bridge.
Article Options
Notes and Media Contacts »
-Annual handling capacity: 1.5 million teu
-Draft: up to 18m
-Dedicated approach channel
-Separate feeder berth
-Provision for Saudi Land Bridge connectivity
-State-of-the-art equipment with dual-lift capability
-Adjacent bonded re-export zone managed by Tusdeer
Red Sea Gateway Terminal vision
"To be an engine of growth for the economy and business by providing world- class integrated logistics solutions, as well as port development and operations."
Loai M. Mushaikh
Corporate Communication & Business Development
PO Box 10460, Jeddah 21433, Saudi Arabia
Tel. +966 (02) 606 4284
Fax +966 (02) 606 4288
Disclaimer »
Articles in this section are primarily provided directly by the companies appearing or PR agencies which are solely responsible for the content. The companies concerned may use the above content on their respective web sites provided they link back to http://www.ameinfo.com
Any opinions, advice, statements, offers or other information expressed in this section of the AMEinfo.com Web site are those of the authors and do not necessarily reflect the views of AME Info FZ LLC / 4C. AME Info FZ LLC / 4C is not responsible or liable for the content, accuracy or reliability of any material, advice, opinion or statement in this section of the AMEinfo.com Web site.
For details about submitting your stories, please read the guide - all content published is subject to our terms and conditions

Posted by Medilyn Manibo, Assistant News Editor



