Harris Pye erects power boiler sets in Sharjah

  • United Arab Emirates: Tuesday, July 28 - 2009 at 11:50
  • PRESS RELEASE

Well-known the world over for its expertise with marine boilers, the Harris Pye Group is rapidly making a name for itself for the repair, refurbishment and installation of land based process, industrial and power plant boilers.

Article continues below
 
One of its most recent successes has been the erection of two substantial power boiler sets and associated equipment in Sharjah UAE, at the Green Dome Petro-Chemical Company Ammonia Plant.

The boiler sets which were of Indian manufacture and supplied by Green Dome, are designed to supply steam for power and the process requirements of the Green Dome plant in the Hamiriyah Free Zone in Sharjah.

Supplied in knock down form to facilitate shipping and handling, the boilers were an integral part of the project to construct and commission a new Anhydrous Ammonia plant. Both were rated at 67,500kg of steam per hour at a pressure of 42kg/cm2 and a superheat temperature of 375oC. The resulting product is mainly for export and is normally used in the manufacture of the fertilizer Ammonium Nitrate.

"We were delighted to win this important contract and are aware that there were a number of contributory factors. Although no ASME stamping was required, the fact that we are ASME accredited was certainly a key factor as a measure of our expertise, as was our reputation as one of the world's most highly recommended boiler repair company, our competitive quotation on both price and time, and our ability to undertake tasks other than straightforward boiler installation and discuss and resolve a range of challenges,"
explains Malcolm Jordan, Managing Director of Harris Pye Gulf LLC, the Group's Middle East operating company.

The contract encompassed setting of foundations for structure and boilers and the erection all component parts including structure walkways, ladders, platforms, roof and side cladding; the boiler structure; boiler drums; boiler water wall tubes and superheater; boiler feed pumps; boiler deaerators; forced draught (FD) fans including inlet ducting; chimneys and outlet ducting; economizers (and undertaking their assembly); LP dosing system; sample coolers; burners; all external inter-connecting pipe work including superheater piping, feed water piping, gas supply piping and steam piping. It also covered pressure testing of the entire boiler assembly and of all external inter-linking pipe work.

"To facilitate the whole procedure, we used technologies such as laser and thedolite alignment for confirming the correct set up of the boilers and associated civil works such as support plinths. This was a 'first' for us and well worth repeating on future land-based contracts. Additionally we were awarded contracts for the erection and testing of the demineralised water plant and the Ammonia compressor plant; and carrying out extensive repairs and remedial work to reformer coils. We thoroughly enjoyed working with the Green Dome Petro-Chemical Company over a 15-month period," explains Malcolm Jordan.
Also consider reading:
Log in to request more information from Harris Pye Group

Notes and media contacts

About Harris Pye:
The Harris Pye Group is a rapidly expanding global player with active involvement in many key marine and industrial sectors. Operating worldwide on a 24/7 basis, the Group's emphasis is on cost effective repair, preventative maintenance and conversion work.

Staff strength within the Group has grown from 10 in 1976 to 750+ employees in our United Kingdom head office facility and main stations in Dubai and Singapore (all three are ASME 'R", 'U' and 'S' stamp accredited); and offices and repair facilities in Scandinavia, Portugal, Brazil, Bahrain, Indonesia, Malaysia and Japan as well as its new office in Australia.

The Group has an enviable reputation as one of the world's leading specialists in repair of marine and industrial boilers, including all associated steam systems. A constant stock of over 400 tons of premium quality steel and alloy tubes ensures rapid reaction to clients' repair requirements. The Group has recently undergone substantial planned growth, and expanded by means of internal expansion and acquisition, into areas complimentary to its core business.

Harris Pye has expertise in automation, control engineering and ship repair; industrial services; the manufacture of food-grade stainless steel galley/land-based kitchen equipment; and ship outfitting. Over the past 10 years, the Group has also successfully developed its service to the offshore oil industry to include in situ repair, upgrade and conversion of rigs, semi-submersibles, trading tankers, FSU, FSO, FPSO and FSRU units.

The Group philosophy is to provide a global service with a focus on supplying top quality products and fast and efficient customer service.

For more information, please contact:
Judith Patten @ JPPR
34 Ellerker Gardens
Richmond TW10 6AA
Tel: +44 (0)208 241 1912
Fax: +44 (0)208 940 6211

Disclaimer:

Articles in this section are primarily provided directly by the companies appearing or PR agencies which are solely responsible for the content. The companies concerned may use the above content on their respective web sites provided they link back to http://www.ameinfo.com

Any opinions, advice, statements, offers or other information expressed in this section of the AMEinfo.com Web site are those of the authors and do not necessarily reflect the views of AME Info FZ LLC / Emap Limited. AME Info FZ LLC / Emap Limited is not responsible or liable for the content, accuracy or reliability of any material, advice, opinion or statement in this section of the AMEinfo.com Web site.

For details about submitting your stories, please read the guide - all content published is subject to our terms and conditions